The buildings include:
The warehouse complex is equipped with concrete floors with strengthened dust-resistant cover. Heated building rooms are equipped with:
The preparatory works include:
OTHER PROJECTS
DESIGN OF SBERBANK’S MANAGER OFFICE
DESIGN OF THE CORPORATE UNIVERSITY OF SBERBANK OF RUSSIA
CONCEPT DESIGN IN THE SHEREMETYEVO AIRPORT HOTEL
JOHN DEERE assembly plant