TECHNOLOGICAL PREPARATION OF MERCEDES-BENZ PRODUCTION FACILITIES

TYPE OF WORKS: Technological preparation of MBR production facilities

SERVICES: General Contractor

CLIENT: «Mercedes-Benz Rus»

LOCATION: Peshkovskoye settlement, Solnechnogork region, Moscow region

AREA OF CONSTRUCTION: 320 000 m2

PERIOD OF CONSTRUCTION: 19.10.16 – 16.06.17

Types of works:

  • Construction of temporary roads;
  • Ground improvement with cement;
  • Bearing layer placement;
  • Asphalt layer placement;
  • Quality control of the earthworks;
  • Construction of the drainage channel;
  • Installation of the construction camp foundation;
  • Installation of temporary power and water supply networks.

OTHER PROJECTS

ROAD CONSTRUCTION FROM THE SMALL MOSCOW RING RYAZANO-KASHIRSKOYE SHOSSE (A-107) TO BELYE STOLBY MICRODISTRICT, DOMODEDOVO

Earthworks at the land plot totaling 84,4 Ha

Construction of Leroy Merlin warehousing and distribution complex with in-built administrative facilities and amenities

Firefighting pump station with overhead tanks