PEPSI bottling plant (phase 2) — MEGA-STROY

PEPSI bottling plant (phase 2)

(Русский) МЕГА-СТРОЙ – завод безалкогольных напитков PEPSI (2 очередь)

TYPE OF WORKS: Construction of the plant

SERVICES: General Contractor, General Designer, field supervision, construction management, connection to external utility networks

CLIENT: Pepsi Bottling Group

LOCATION: Domodedovo district, Moscow region

AREA OF CONSTRUCTION: 41 000 m2

PERIOD OF CONSTRUCTION: 09.2007 - 07.2009

Phase II of construction includes:

  • Manufacturing and warehouse complex;
  • Administrative building and amenities;
  • Energy center;
  • Cargo access point 2;
  • Car washes, truck standing areas.

The next phase of construction (III) will include:

  • Office areas and amenities (truck repair workshop, raw material and package warehouse, refrigerator repair and maintenance block);
  • Warehouses for cargo storage are equipped with passway multistoried racks.

OTHER PROJECTS

YUZHNYE VRATA INDUSTRIAL AND LOGISTICS COMPLEX

DESIGN OF SBERBANK’S MANAGER OFFICE

DESIGN OF THE CORPORATE UNIVERSITY OF SBERBANK OF RUSSIA

CONCEPT DESIGN IN THE SHEREMETYEVO AIRPORT HOTEL


Request

Request

REQUEST