CONSTRUCTION OF WAREHOUSES — MEGA-STROY

CONSTRUCTION OF WAREHOUSES

Modern warehouses meet the requirements of structures for long-term product storage. There are structures that provide with product safety due to low temperatures or, on the contrary, well-heated structures. MEGA-STROY, LLC builds warehouses of different purpose. The company has been engaged in construction for over 20 years and delivered numerous projects. Warehouse erection shall be conditioned with the location of the structure and delivery of required temperature mode, that is why it is better to handover this to the professionals. Construction of heated warehouses Nowadays it is more profitable to build a steel framed warehouse than a brick one. The main advantage is period of construction. Due to innovative technologies that allow equipping such warehouse in full, the construction of the above is not just cheap but also strategically beneficial. It is possible to make heat insulation and to arrange heat supply to a hangar, but it requires significant investments and time. It is more efficient to build a warehousing building with consideration of heat supply. Estimate of actual boiler house equipment is made when developing the project of construction. When erecting structures at the initial stages, all communications and systems are buried. All required devices and equipment are installed. there are certain peculiarities when building heated warehousing building that our specialists are aware of. Preparation for warehouse construction Before star of warehouse construction, it is required to mark its location. Often it is more expensive within the city boundaries than in its outskirts. The cheap land plot will reduce the total cost of construction. Before construction, a group of experts shall define bearing capacity of the ground and issue a relevant conclusion. After that, the technical task is prepared, commission terms are discussed. At this stage, height of the warehouse is chosen and heating (refrigerating) systems requirements are defined. When the above issues are agreed and approved that process of the building’s sketch and drawing development starts. There is selection and calculation of communication means, equipment and the construction process starts.


Request

Request

REQUEST