{"id":1187,"date":"2007-12-27T17:49:46","date_gmt":"2007-12-27T14:49:46","guid":{"rendered":"http:\/\/mega-stroy.su\/?p=1187"},"modified":"2019-06-13T16:04:03","modified_gmt":"2019-06-13T13:04:03","slug":"proizvodstvenno-logisticheskij-kompleks-severnoe-domodedovo-2-ya-ochered","status":"publish","type":"post","link":"https:\/\/mega-stroy.su\/en\/2007\/12\/27\/proizvodstvenno-logisticheskij-kompleks-severnoe-domodedovo-2-ya-ochered\/","title":{"rendered":"PRODUCTION AND LOGISTICS COMPLEX SEVERNOYE DOMODEDOVO (PHASE 2)"},"content":{"rendered":"<p>The buildings include:<\/p>\r\n<ul>\r\n\t<li>manufacturing and warehouse areas (operational areas, office areas, technical areas) for storage and processing of general purpose products with in-built office and technical premises;<\/li>\r\n\t<li>security gatehouses;<\/li>\r\n\t<li>parking areas;<\/li>\r\n\t<li>open storage areas.<\/li>\r\n<\/ul>\r\n<p>During assembly of the manufacturing and logistics complex Severnoye Domodedovo (Phase 2), there was made concrete flooring with strengthened dust-resistant cover. The heated buildings are equipped with:<\/p>\r\n<ul>\r\n\t<li>sprinkler firefighting system;<\/li>\r\n\t<li>power supply;<\/li>\r\n\t<li>supply and exhaust ventilation;<\/li>\r\n\t<li>own boiler house and heat network.<\/li>\r\n<\/ul>\r\n<p>Walling \u2013 sandwich panels. Strip glazing at the level of the office areas. Membrane roof.<\/p>","protected":false},"excerpt":{"rendered":"<p>The buildings include: manufacturing and warehouse areas (operational areas, office areas, technical areas) for storage and processing of general purpose products with in-built office and technical premises; security gatehouses; parking areas; open storage areas. During assembly of the manufacturing and logistics complex Severnoye Domodedovo (Phase 2), there was made concrete flooring with strengthened dust-resistant cover. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5150,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2],"tags":[10,12,11],"class_list":["post-1187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizovannye-proekty","tag-proektirovanie","tag-skladskie-kompleksy","tag-stroitelstvo"],"acf":[],"_links":{"self":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/1187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/comments?post=1187"}],"version-history":[{"count":10,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/1187\/revisions"}],"predecessor-version":[{"id":5169,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/1187\/revisions\/5169"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/media\/5150"}],"wp:attachment":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/media?parent=1187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/categories?post=1187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/tags?post=1187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}