{"id":437,"date":"2017-04-26T11:53:02","date_gmt":"2017-04-26T08:53:02","guid":{"rendered":"http:\/\/mega-stroy.su\/?p=437"},"modified":"2019-05-16T15:15:29","modified_gmt":"2019-05-16T12:15:29","slug":"preimushhestva-i-nedostatki-generalnogo-podryada-na-stroitelstvo-kommercheskih-zdanij","status":"publish","type":"post","link":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/preimushhestva-i-nedostatki-generalnogo-podryada-na-stroitelstvo-kommercheskih-zdanij\/","title":{"rendered":"ADVANTAGES AND DISAGVANTAGES OF GENERAL CONTRACTING FOR CONSTRUCTION OF COMMERCIAL BUILDINGS"},"content":{"rendered":"<p><a href=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/stroitelstvo-kommercheskih-zdanij.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"st_imgs alignnone wp-image-439 size-medium\" src=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/stroitelstvo-kommercheskih-zdanij.jpg\" alt=\"\" width=\"300\" height=\"225\" \/><\/a> General contracting system helps company owners to arrange <a href=\"\/en\/\">construction works<\/a> for different buildings and structures in a right way \u2013 thus achieving opportunity to impose responsibility for the project implementation to a third authorized person. <!--more--> The client, for example, do not have to do the following:<\/p>\r\n<ul>\r\n\t<li>Search for executive party for all types of works;<\/li>\r\n\t<li>Purchase of required materials;<\/li>\r\n\t<li>Execution of documentation;<\/li>\r\n\t<li>Follow up the project progressing.<\/li>\r\n<\/ul>\r\n<p>Many companies underestimate role of such organizations. The general contracting services help company owners not only to save a lot of time but also to reduce investments significantly. <strong>Selection of cooperation option<\/strong> Depending on the selected option of cooperation within the general contracting for construction, the clients might receive:<\/p>\r\n<ul>\r\n\t<li>Detailed consultations on the issues in the field of design and processing. Investors are assisted in arrangement of works, development of technical tasks, conduct of expertise, acceptance of projects, etc.<\/li>\r\n\t<li>Development of management structure and its application for the project processing. Investors search for executive party and perform control over processed works.<\/li>\r\n\t<li>Turnkey activities. Within the general contracting services, there is a system of organizational, design and construction works. The investor interacts only with one company \u2013 significant saving of time and investments.<\/li>\r\n<\/ul>\r\n<p><strong>To select experienced specialists \u2013 to receive the complete scope of advantages<\/strong> Selection of an organization shall be treated seriously. Only professionals can deliver your project within the shortest period of time and with good quality.<\/p>\r\n<ul>\r\n\t<li>Employees of experienced companies are good in construction, aware of current market situation, able to compose a perfect working schedule and to reduce expenses. The general contracting principle is to set up credible business connections.<\/li>\r\n\t<li>Perfect coordination of specialists\u2019 activities at all project working stages leads to significant decrease of time for delivery. It also expedites the process of documentation preparation. Stoppage time is minimal.<\/li>\r\n\t<li>Only high qualification of employees allow performing project acceptance and control of good quality without missing a thing.<\/li>\r\n<\/ul>\r\n<p>Such services cost investments. Choice of the best company is a way to successful erection of commercial real estate.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in \u0420\u0443\u0441\u0441\u043a\u0438\u0439.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-437","post","type-post","status-publish","format-standard","hentry","category-stati"],"acf":[],"_links":{"self":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/comments?post=437"}],"version-history":[{"count":9,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/437\/revisions"}],"predecessor-version":[{"id":4592,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/437\/revisions\/4592"}],"wp:attachment":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/media?parent=437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/categories?post=437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/tags?post=437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}