{"id":458,"date":"2017-04-26T12:39:07","date_gmt":"2017-04-26T09:39:07","guid":{"rendered":"http:\/\/mega-stroy.su\/?p=458"},"modified":"2019-05-16T13:45:45","modified_gmt":"2019-05-16T10:45:45","slug":"chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva","status":"publish","type":"post","link":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/","title":{"rendered":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION"},"content":{"rendered":"<p><a href=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\"><img decoding=\"async\" class=\"st_imgs alignleft wp-image-459 size-medium\" src=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\" alt=\"\" width=\"300\" height=\"216\" \/><\/a> There are many types of earthworks required in construction:<\/p>\r\n<ul>\r\n\t<li>Open;<\/li>\r\n\t<li>Underground;<\/li>\r\n\t<li>Underwater<\/li>\r\n<\/ul>\r\n<p><!--more--> It goes without saying that the most frequent earthworks are open ones. Underground earthworks are required for, for example, relaying or replacement of utility networks. Types of earthworks in construction are classified in accordance with what soil is to be excavated and what is to be done with it further. There are several structures: pits, trenches, mounds, etc. <a href=\"\/en\/development\/prodazha-zemelnyh-uchastkov\/\">Earthworks in building construction<\/a> precede the erection processing itself. They are made only after development of the drawing of the project\u2019s layout. Earthworks influence future structure\u2019s life a lot: how long and successful it will be for the owner, lessees and visitors themselves. <strong>Earthworks methods<\/strong> Methods of earthworks I construction differ at every stage. It depends on numerous factors (ground quality, proximity of ground waters, dimensions of a planned building, etc.). If you decide to process any earthworks during wintertime, it is important to consider the level of soil freezing. Ground settlement and depth of the future pit is defined based on these and a number of other factors.<\/p>\r\n<p style=\"text-align: center;\"><a href=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/oborydovanie-dlya-zemlyanyh-rabot.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-460\" src=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/oborydovanie-dlya-zemlyanyh-rabot.jpg\" alt=\"\" width=\"640\" height=\"401\" \/><\/a><\/p>\r\n<p>It is required to use particular equipment for earthworks in construction. The following might be used:<\/p>\r\n<ul>\r\n\t<li>Excavators (caterpillar, levelling excavator, etc.);<\/li>\r\n\t<li>Truck graders;<\/li>\r\n\t<li>Bulldozers;<\/li>\r\n\t<li>Trenchers;<\/li>\r\n\t<li>Self-propelled drilling units, etc.<\/li>\r\n<\/ul>\r\n<p>Large construction companies may afford their purchase or rental. But considering the equipment prices, it is cheaper and easier to rent the specialized equipment for earthworks. The cost is defined based on the period of use and the model of required equipment. And that is one of the convenient and profitable options as MEGA-STROY, LLC cares for safety, service maintenance, storage and transportation of the provided equipment. The specialized equipment for earthworks before start of construction guarantees that everything will be processed in time and with good quality. Uninterruptable operation of machinery will provide with credible future existence of projects whether it is a business center, a country house, a warehouse or a hangar. Following the technologies, professional team and equipment of high quality \u2013 these all allowed MEGA-STROY to concur trust of the clients. When addressing to us, you will receive a detailed consultation on all types of earthworks and will rent the equipment on profitable prices. The Company also renders services on earthworks and construction works from design to utilities connection to the project.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in \u0420\u0443\u0441\u0441\u043a\u0438\u0439.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-458","post","type-post","status-publish","format-standard","hentry","category-stati"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION<\/title>\n<meta name=\"description\" content=\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\" \/>\n<meta property=\"og:description\" content=\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/\" \/>\n<meta property=\"og:site_name\" content=\"MEGASTROY\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-26T09:39:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-05-16T10:45:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#\\\/schema\\\/person\\\/244cd4d3afff9fa840b415eaa84f776b\"},\"headline\":\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\",\"datePublished\":\"2017-04-26T09:39:07+00:00\",\"dateModified\":\"2019-05-16T10:45:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/\"},\"wordCount\":1543,\"publisher\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mega-stroy.su\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\",\"articleSection\":[\"ARTICLES\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/\",\"url\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/\",\"name\":\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mega-stroy.su\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\",\"datePublished\":\"2017-04-26T09:39:07+00:00\",\"dateModified\":\"2019-05-16T10:45:45+00:00\",\"description\":\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mega-stroy.su\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\",\"contentUrl\":\"https:\\\/\\\/mega-stroy.su\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/2017\\\/04\\\/26\\\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430\",\"item\":\"https:\\\/\\\/mega-stroy.su\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#website\",\"url\":\"https:\\\/\\\/mega-stroy.su\\\/\",\"name\":\"MEGASTROY\",\"description\":\"[:ru]\u041f\u0440\u043e\u0435\u043a\u0442\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435 \u0438 \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u0441\u0442\u0432\u043e \u043a\u043e\u043c\u043c\u0435\u0440\u0447\u0435\u0441\u043a\u043e\u0439 \u043d\u0435\u0434\u0432\u0438\u0436\u0438\u043c\u043e\u0441\u0442\u0438  [:en]MEGA-STROY, LLC is \u2013 a reliable and proven construction company[:]\",\"publisher\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mega-stroy.su\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#organization\",\"name\":\"\u041e\u041e\u041e \u041c\u0415\u0413\u0410-\u0421\u0422\u0420\u041e\u0419-\u041c\",\"url\":\"https:\\\/\\\/mega-stroy.su\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mega-stroy.su\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/megastroy_kvadrat-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/mega-stroy.su\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/megastroy_kvadrat-scaled.jpg\",\"width\":2560,\"height\":2501,\"caption\":\"\u041e\u041e\u041e \u041c\u0415\u0413\u0410-\u0421\u0422\u0420\u041e\u0419-\u041c\"},\"image\":{\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mega-stroy.su\\\/#\\\/schema\\\/person\\\/244cd4d3afff9fa840b415eaa84f776b\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c181b37ff93509b4765123886930eef0c5c0cccf6e6876a034a684ad5a13331d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c181b37ff93509b4765123886930eef0c5c0cccf6e6876a034a684ad5a13331d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c181b37ff93509b4765123886930eef0c5c0cccf6e6876a034a684ad5a13331d?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\\\/\\\/mega-stroy.su\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","description":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/","og_locale":"en_US","og_type":"article","og_title":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","og_description":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","og_url":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/","og_site_name":"MEGASTROY","article_published_time":"2017-04-26T09:39:07+00:00","article_modified_time":"2019-05-16T10:45:45+00:00","og_image":[{"url":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg","type":"","width":"","height":""}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#article","isPartOf":{"@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/"},"author":{"name":"admin","@id":"https:\/\/mega-stroy.su\/#\/schema\/person\/244cd4d3afff9fa840b415eaa84f776b"},"headline":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","datePublished":"2017-04-26T09:39:07+00:00","dateModified":"2019-05-16T10:45:45+00:00","mainEntityOfPage":{"@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/"},"wordCount":1543,"publisher":{"@id":"https:\/\/mega-stroy.su\/#organization"},"image":{"@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#primaryimage"},"thumbnailUrl":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg","articleSection":["ARTICLES"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/","url":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/","name":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","isPartOf":{"@id":"https:\/\/mega-stroy.su\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#primaryimage"},"image":{"@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#primaryimage"},"thumbnailUrl":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg","datePublished":"2017-04-26T09:39:07+00:00","dateModified":"2019-05-16T10:45:45+00:00","description":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION","breadcrumb":{"@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#primaryimage","url":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg","contentUrl":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2017\/04\/zemlyanye-raboty-pered-nachalom-stroitelstva.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/mega-stroy.su\/en\/2017\/04\/26\/chto-sleduet-znat-o-provedenii-zemlyanyh-rabot-pered-nachalom-stroitelstva\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f \u0441\u0442\u0440\u0430\u043d\u0438\u0446\u0430","item":"https:\/\/mega-stroy.su\/"},{"@type":"ListItem","position":2,"name":"WHAT IS NEED TO BE KNOWN ABOUT EARTHWORKS BEFORE START OF CONSTRUCTION"}]},{"@type":"WebSite","@id":"https:\/\/mega-stroy.su\/#website","url":"https:\/\/mega-stroy.su\/","name":"MEGASTROY","description":"[:ru]\u041f\u0440\u043e\u0435\u043a\u0442\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435 \u0438 \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u0441\u0442\u0432\u043e \u043a\u043e\u043c\u043c\u0435\u0440\u0447\u0435\u0441\u043a\u043e\u0439 \u043d\u0435\u0434\u0432\u0438\u0436\u0438\u043c\u043e\u0441\u0442\u0438  [:en]MEGA-STROY, LLC is \u2013 a reliable and proven construction company[:]","publisher":{"@id":"https:\/\/mega-stroy.su\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mega-stroy.su\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mega-stroy.su\/#organization","name":"\u041e\u041e\u041e \u041c\u0415\u0413\u0410-\u0421\u0422\u0420\u041e\u0419-\u041c","url":"https:\/\/mega-stroy.su\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mega-stroy.su\/#\/schema\/logo\/image\/","url":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2022\/07\/megastroy_kvadrat-scaled.jpg","contentUrl":"https:\/\/mega-stroy.su\/wp-content\/uploads\/2022\/07\/megastroy_kvadrat-scaled.jpg","width":2560,"height":2501,"caption":"\u041e\u041e\u041e \u041c\u0415\u0413\u0410-\u0421\u0422\u0420\u041e\u0419-\u041c"},"image":{"@id":"https:\/\/mega-stroy.su\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mega-stroy.su\/#\/schema\/person\/244cd4d3afff9fa840b415eaa84f776b","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c181b37ff93509b4765123886930eef0c5c0cccf6e6876a034a684ad5a13331d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c181b37ff93509b4765123886930eef0c5c0cccf6e6876a034a684ad5a13331d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c181b37ff93509b4765123886930eef0c5c0cccf6e6876a034a684ad5a13331d?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/mega-stroy.su\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/comments?post=458"}],"version-history":[{"count":9,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/458\/revisions"}],"predecessor-version":[{"id":4588,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/posts\/458\/revisions\/4588"}],"wp:attachment":[{"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/media?parent=458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/categories?post=458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mega-stroy.su\/en\/wp-json\/wp\/v2\/tags?post=458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}