PRODUCTION AND LOGISTICS COMPLEX SEVERNOYE DOMODEDOVO (PHASE 2) — MEGA-STROY

PRODUCTION AND LOGISTICS COMPLEX SEVERNOYE DOMODEDOVO (PHASE 2)

(Русский) МЕГА-СТРОЙ – производственно-логистический комплекс «Северное Домодедово» (2-я очередь)

TYPE OF WORKS: Construction of the warehouse complex

SERVICES: General Contractor, General Designer, field supervision, connection to external networks

CLIENT:

LOCATION: Domodedovo district, Moscow region

AREA OF CONSTRUCTION: 184 000 m2

PERIOD OF CONSTRUCTION: 02. 2007 - 12. 2007

The buildings include:

  • manufacturing and warehouse areas (operational areas, office areas, technical areas) for storage and processing of general purpose products with in-built office and technical premises;
  • security gatehouses;
  • parking areas;
  • open storage areas.

During assembly of the manufacturing and logistics complex Severnoye Domodedovo (Phase 2), there was made concrete flooring with strengthened dust-resistant cover. The heated buildings are equipped with:

  • sprinkler firefighting system;
  • power supply;
  • supply and exhaust ventilation;
  • own boiler house and heat network.

Walling – sandwich panels. Strip glazing at the level of the office areas. Membrane roof.

OTHER PROJECTS

WESTVACOEASTPRINT PACKING PLANT

BENNING ADMINISTRATIVE AND MANUFACTURING COMPLEX

PEPSI bottling plant (phase 2)

YUZHNYE VRATA INDUSTRIAL AND LOGISTICS COMPLEX


Request

Request

REQUEST