TYPE OF WORKS: Construction of the warehouse complex
SERVICES: General Contractor, General Designer, field supervision, construction management, connection to external networks
CLIENT: Pepsi Bottling Group
LOCATION: Domodedovo district, Moscow region
AREA OF CONSTRUCTION: 14 000 m2
PERIOD OF CONSTRUCTION: 11.2006 - 05.2007
The plant is a part of the production and logistics complex Severnoye Domodedovo and consists of three phases of construction. The total area of construction of the first phase is 14Β 000 m2. The first phase of construction consists of:
The buildingβs structural scheme is frames, braced-framed.