Архивы News - Page 7 of 14 - MEGASTROY

News

MEGA-STROY RECEIVES DUNS NUMBER

(Русский) «МЕГА-СТРОЙ» получил Знак доверия DUNS

04.03.2016

MEGA-STROY Company has registered in D&B international system and received DUNS (or D-U-N-S) individual number.

Read more

MEGA-STROY, LLC DESIGNS BUILDINGS USING THE LATEST BIM TECHNOLOGY

(Русский) ООО «Мега-Строй» проектирует здания по ультрасовременной технологии BIM

04.03.2016

Building information modelling is an innovative method of design giving new opportunities to construction companies allover the world.

Read more

CEREMONIAL OPENING IF THE AUTONOMOUS GAS BOILER STATION IN BOLSHOYE DOMODEDOVO

МЕГА-СТРОЙ - cEREMONIAL OPENING IF THE AUTONOMOUS GAS BOILER STATION IN BOLSHOYE DOMODEDOVO

15.10.2015

October 15, 2015. The ceremonial launch of the autonomous gas boiler station No. 2 took place in Yuzhny microdistrict of Domodedovo town district.

Read more

IN SEPTEMBER 2015 A NEW CONTRACT IS SIGNED WITH PEPSICO

МЕГА-СТРОЙ - iN SEPTEMBER 2015 A NEW CONTRACT IS SIGNED WITH PEPSICO

18.09.2015

MEGA-STROY will start design and construction of a firefighting pump station with two overhead tanks 1 100 m3 each at PepsiCo plant in Domodedovo district. Area of construction including asphalting and greening is 1 250 m2.

Read more

CONSTRUCTION OF LEROY MERLIN DISTRIBUTION AND WAREHOUSE COMPLEX WITH IN-BUILT ADMINISTRATUVE FACILITIES

МЕГА-СТРОЙ - cONSTRUCTION OF LEROY MERLIN DISTRIBUTION AND WAREHOUSE COMPLEX WITH IN-BUILT ADMINISTRATUVE FACILITIES

05.09.2015

In September 2015 MEGA-STROY started construction of A-class warehouse complex totaling 97 000 m2 for Leroy Merlin.

Read more

MEGA-STROY IS TAKING PART IN LARGE-SCALE RECONSTRUCTION OF THE ROADS IN THE MOSCOW REGION

(Русский) «Мега-Строй» участвует в масштабной реконструкции подмосковных дорог

30.08.2015

MEGA-STROY has participated in the large state and commercial project and is delivering civil works on renewal of the road cover of the part of Domodedovskoye shosse successfully under increased infrastructure requirements.

Read more

MEGA-STROY BUILT CHETTYRE SEZONA

(Русский) «Мега-Строй» возвел «Четыре сезона»

30.08.2015

The fruit and vegetable center at the largest logistics complex of the southern part of the Moscow region Chetyre sezona has been built and is functioning smoothly. MEGA-STROY has executed construction of the modern warehouse for storage of fruits, berries, vegetables.

Read more

RECONSTRUCTION OF A PART OF DOMODEDOVSKOY SHOSSE BY MEGA-STROY

(Русский) Реконструкция участка Домодедовского шоссе силами Компании «МЕГА-СТРОЙ»

12.08.2015

In August 1015 the Design and Road Departments of MEGA-STROY started works on reconstruction of road clothes totaling 3187 m2 at the part of the road Krym-Pavlovskoye nearby Domodedovo village.

Read more

Subscribe to news

[wysija_form id="1"]

Request

Request

REQUEST